A seam either passes survey or it does not.
Plating, frames, tanks and hardware in steel, aluminium and stainless — welded by RINA-certified hands with a surveyor watching the ones that matter.
WORKSHOP 03 · REVIVA REFIT
WHAT COMES OUT OF THIS DOOR
FOUR DISCIPLINES
01
Hull & plating
Plate renewal, doublers and frame repair, mapped from the survey's thickness readings.
02
Tanks & voids
Fuel, water and waste tanks built, repaired and pressure-tested before anything covers them.
03
Fabrication
Davits, rails, gates, exhaust and bespoke hardware, drawn in-house and made a hundred metres from the berth.
04
Class approvals
Welding procedures and welder qualifications held current with RINA, Lloyd's, DNV and Türk Loydu.
ON THE FLOOR
PHOTOGRAPHED THIS SEASON
Certified, witnessed, and written down.
0
CLASS SOCIETIES
0
LARGEST HANDLED
0
SURVEY POINTS MAPPED