Half the job is what is behind the panel.
Rewiring yachts whose original loom diagram no longer exists, and leaving behind a drawing that matches what is actually aboard.
WORKSHOP 05 · REVIVA REFIT
WHAT COMES OUT OF THIS DOOR
FOUR DISCIPLINES
01
Rewiring
AC and DC distribution, 24 V through 400 V, renewed to current marine practice and labelled at both ends.
02
Switchboards
Panels built, tested and commissioned in-house, with breakers sized to the load that is really there.
03
Navigation & comms
Electronics, autopilots, radar and satellite installed and calibrated on the water.
04
As-built drawings
Every circuit redrawn and handed over — the deliverable most owners have never had before.
ON THE FLOOR
PHOTOGRAPHED THIS SEASON
You leave with a diagram that is true.
0
SYSTEMS HANDLED
0
APPRENTICESHIP
0
AS-BUILT DRAWN